HANSON — Nov. 17, 2026 — The Hanson Select Board last Tuesday authorized Town Administrator Lisa Green to sign an activity and use limitation for the town-owned Hawks Ave property, a recorded restriction the board was told is needed to close out the site’s cleanup. The limits would cover 0.31 acres of the 9.5-acre parcel.
The Full Story
Site history. Joshua Klement of Verdantas, the licensed site professional of record for the property, told the board the town acquired about 9.5 acres from Light Control by donation deed in August 2019. He said Light Control’s consultant filed a closure report before the donation, but the town needed to know whether that investigation left data gaps.
Klement said Verdantas helped the town secure a MassDevelopment brownfields assessment grant in 2024, and the follow-up assessments found two new reporting conditions, reported to MassDEP, from contaminated soil outside areas identified earlier.
He described three areas of concern: metals including antimony, lead, chromium and zinc in soil between the two buildings; lead, other metals, petroleum and some PCBs beneath the slab of the southern building; and petroleum 10 to 13 feet down that the earlier consultant had already identified. Klement said the first area was chosen for cleanup partly because it carried the highest potential for exposure, and that the deeper petroleum did not represent a new reporting condition under the Massachusetts Contingency Plan.
It’s important to note that there are several use restrictions in that donation deed.
— Joshua Klement, Verdantas 7:53
He said those deed restrictions, including limits on residential and recreational use, apply to the whole parcel.
Cleanup and limits. The board was told the first area was dug out to 5 feet and slightly more than 400 tons of soil went by truck to a licensed disposal facility in New Hampshire, with a completion report filed in July. Residual soil at the edges of that excavation and soil gas beneath the southern building’s slab require the limitation on a small portion of the property to maintain a condition of no significant risk.
Current uses, including storage of town vehicles and equipment, remain allowed. Digging inside the restricted area would require a soil management plan and a health and safety plan. Single-family homes, schools and recreational facilities would be prohibited there. The northern building is outside the limit.
The board was told MassDEP does not sign off on closure reports; under the state’s privatized system, a licensed site professional does. A risk assessment found no significant risk for passersby and outdoor workers, the board was told.
During questions, a secondhand account was relayed from a former worker, since deceased, who said drums had been buried on the property. The response was that a small number of drums and containers had been removed from the town parcel before the town took it over.
Asked whether the results could support lifting the deed restrictions on the rest of the land, the board was told that could be a path but to consult a real estate lawyer. The limitation itself could later be shrunk or removed with more investigation or cleanup.
Next steps. A survey plan and the limitation must be recorded at the Plymouth County Registry of Deeds before a permanent solution with conditions can be filed, and current funding expires at year’s end. The town clerk must certify the signatory vote with a wet signature. The presentation credited the effort with more than $337,000 from MassDevelopment, plus Old Colony Planning Council assessment money.